Mon - Fri 8:00 - 18:00 / Sunday 8:00 - 14:00
The Bedarin Hotel project involved the design and installation of a 62kW hybrid solar PV system, integrated with a 40kWh lithium-ion battery bank. The system was engineered to provide reliable and sustainable energy for the hotel, ensuring seamless operations even during grid outages.
“We are very satisfied with the solar installation at Bedarin Hotel. It has reduced our costs and improved service reliability for our guests. ”- Hotel Manager
Energy Savings: Reduction of up to 60% in electricity bills.
Reliability: Continuous power supply, reducing downtime for hotel services.
Sustainability: Offsetting approximately X tons of CO₂ emissions annually.